Bouaké — Faecal sludge treatment plant

Côte d'Ivoire · 2022 · World Bank / ONAD
Capacity
2 × 22 m³/h
Type
Drying beds
Budget
+2.6 M€
Project owner
ONAD

A major sanitation project for a city that critically needed it. Chosen approach: simple drying beds plus sedimentation basins, with anaerobic and aerobic stages, finishing with macrophytes. Low energy consumption, landscape integration, simple operation.

Installations delivered

  • Discharge platforms2 units
  • Circular reception pits2 × 22 m³/h
  • Settling basins2 units
  • Simple drying beds16 units
  • Anaerobic basins2 units
  • Aerobic basins2 units
  • Macrophyte plantingBiological finishing

WAP scope

Advisory and supply of hydraulic, treatment and electromechanical equipment: bar screens, wall valves, pumps, piping, control devices. Third-party inspection before shipment.