Béoumi — 200 m³/h plant

Côte d'Ivoire · 2020 · World Bank
Capacity
4,000 m³/day
Flow rate
200 m³/h
Budget
+4.5 M€
Funder
World Bank

A project in the technical continuity of Tiassalé: same process, same gravity logic, but sized to cover an extended semi-rural area. Our role: advisory and supply of hydraulic, treatment and electromechanical equipment — lamellar settling, filtration, lime water production via saturator.

WAP scope

  • Lamellar settlingSizing + supply
  • Sand filtrationConstant-level regulation
  • Lime saturatorLime water production
  • Reagent dosingDosing pumps + injection
  • DisinfectionFinal chlorination

Highlights

Gravity plant, low energy consumption, on-site lime storage, 500 m³ treated water tank to absorb demand variations. Minimal maintenance, accessible wear parts.